RESOUCE CALCULATION DETAILS AND METHODOLOGY
Table 1: Woodline 1 Resource by category
| Resource Category | Tonnes | Gold grade g/t | Gold Ounces |
| Indicated | 127,606 | 2.81 | 11,527 |
| Inferred | 4,760 | 4.69 | 718 |
| Total | 132,366 | 2.88 | 12,245 |
The Ore System
The north east striking reef system at Woodline 1 has been modelled over a strike length of 215 metres. The gold mineralisation is masked by 10 metres of transported soils, and the base of weathering is approximately 50 to 60 metres below surface.
As portrayed in Figure 1 and Figure 2 below, the deposit was modelled as four separate geological domains namely:
Fig 1: Woodline 1 model viewed from south and above
Figure 2: Woodline 1 model viewed from East and below
Resource Table by Category
Table 2: Woodline 1 by Resource Category and 5 metre bench.
| Benchtop | Perched |
Supergene Reef |
Total |
||||||
| RI (m) | Tonnes Grade (t) (g/t) |
Tonnes Grade Tonnes Grade (t) (g/t) (t) (g/t) |
Tonnes Grade Ounces (t) (g/t) (oz) |
||||||
| 380 | 953 |
1.96 | 953 | 1.96 |
60 |
||||
| 375 | 18,061 |
3.14 |
1,099 |
5.98 |
19,160 | 3.30 |
2,035 |
||
| 370 | 3,621 |
1.62 |
4,753 |
6.97 |
8,374 |
4.66 |
1,254 |
||
| 365 | 4,690 |
5.93 |
4,690 |
5.93 |
894 |
||||
| 360 | 4,697 |
4.68 |
4,697 |
4.68 |
707 |
||||
| 355 | 4,549 |
3.76 |
4,549 |
3.76 |
550 |
||||
| 350 | 5,716 |
3.36 |
5,716 |
3.36 |
617 |
||||
| 345 | 22,867 |
1.54 |
7,364 | 2.95 |
30,231 |
1.88 |
1,831 |
||
| 340 | 16,047 |
1.50 |
8,307 |
2.80 |
24,354 | 1.94 |
1,522 |
||
| 335 | 8,352 |
2.89 |
8,352 |
2.89 |
776 |
||||
| 330 | 7,456 |
2.90 |
7,456 |
2.90 |
695 |
||||
| 325 | 5,826 |
2.97 |
5,826 |
2.97 |
556 |
||||
| 320 | 4,917 |
2.89 |
4,917 |
2.89 |
457 |
||||
| 315 | 2,233 |
2.85 |
2,233 |
2.85 |
205 |
||||
| 310 | 650 |
3.34 |
650 |
3.34 |
70 |
||||
| 305 | 199 |
2.87 |
199 |
2.87 |
18 |
||||
| 300 | 0 | 0.00 |
0 |
||||||
| Total 22,635 2.85 |
38,914 1.52 |
70,808 3.63 |
132,357 2.88 12,246 |
||||||
Resource Model Parameters
Resource Evaluations modelled the resource using the following parameters: