| Location | Category | Resource Tonnes | Nickel % | Nickel Tonnes |
|
01 & 03 Surfaces - Sulphide Resource |
Measured |
38,543
|
5.5
|
2,135
|
|
|
Indicated
|
34,658
|
4.0
|
1,374
|
|
|
Inferred
|
25,994
|
4.7
|
1,228
|
|
|
Sub-total
|
99,000
|
4.8
|
4,750
|
|
|
|
|
|
|
|
Area 57 - Sulphide Resource |
Measured
|
3,000
|
5.9
|
180
|
|
|
Indicated
|
3,000
|
5.8
|
170
|
|
|
Inferred
|
500
|
5.4
|
30
|
|
|
Sub-total
|
6,500
|
5.8
|
380
|
|
|
|
|
|
|
|
Blair Mine Sulphide Resource |
Total
|
105, 500
|
4.9
|
5,100
|
Table 1: Blair Mine Nickel Mineral Resource as at June 30th 2007
Blair Mine Reserve (Diluted)
| Location | Category | Reserve Tonnes | Nickel % | Nickel Tonnes |
|
01,03 Surfaces - Sulphide Reserve |
Proved |
58,780 | 3.6 | 2,116 |
| Probable | 56,735 | 2.4 | 1,362 | |
| Sub-total | 115,000 | 3.0 | 3,500 | |
|
Area 57 - Sulphide Reserve |
Proved | 6,981 | 2.4 | 168 |
| Probable | 7,569 | 2.3 | 174 | |
| Sub-total | 14,550 | 2.3 | 340 | |
|
Blair Mine Sulphide Reserve |
Total | 130,000 | 2.9 | 3,800 |
Table 2: Blair Mine Nickel Mineral Reserves as at June 30th 2007
The information in the table above that relates to
| Location | Category | Resource Tonnes | Nickel % | Nickel Tonnes |
|
Blair South – Sulphide Resource |
Measured |
0 | 0.00 | 0 |
| Indicated | 0 | 0.00 | 0 | |
| Inferred | 74,000 | 1.35 | 1,000 | |
| Sub-total | 74,000 | 1.35 | 1,000 | |
|
Marriott’s – Sulphide Resource |
Measured |
0 | 0.00 | 0 |
| Indicated | 460,000 | 1.12 | 5,100 | |
| Inferred | 370,000 | 1.15 | 4,300 | |
| Sub-total | 830,000 | 1.13 | 9,400 | |
Table 3: Other nickel sulphide resources as at November 14th 2007
GOLD RESOURCES
Woodline 1 Resource (UNDILUTED)
| Location | Category | Resource Tonnes | Gold g/t |
Gold Ounces |
| Woodline 1 | ||||
| Indicated | 123,000 | 2.9 | 11,500 | |
| Inferred | 5,000 | 4.6 | 700 | |
| Total | 128,000 | 3.0 | 12,200 |
Table 4: Woodline 1 resource as at June 30th 2007
The resource models in this report that relates to Mineral Resources were reviewed by Mr E Poole who is a professional geologist with 20 years experience and is a Member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr E Poole is a full time employee of the Company. Mr Poole has sufficient experience which is relevant to nickel sulphide mineralisation and resource estimation to qualify as a competent person as defined in the December 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and