7 September 2006

EXPLORATION UPDATE: BLAIR NICKEL MINE

Significant diamond drill results from Blair Deeps and Area 57 orebodies

Australian Mines Limited (ASX: AUZ) is pleased to announce the results of the August underground diamond drilling campaigns at the Blair Mine.

General Background

The Blair Nickel Mine is currently producing ore from 3 sources, namely the;
  • Blair Deeps,
  • L01C surface, and
  • Area 57 orebody.

The company has recently completed drilling at each of these areas and an update is presented below:

Blair Deeps

Best results include:
  • 3.0m @ 4.52 % Ni on the open contact west of the E03C Shoot and has opened up new ore potential on this surface,
  • 19.6 m @ 3.62 % Ni % on the C01C Shoot
Hole Number Northing (m) Easting (m) RL (m) Depth (m) From (m) To (m) Length (m) Ni (%)
AMUG182A 6578944 376848.6 441.1 140.5 99.4 101.72 2.32 3.81
AMUG183 6578943.7 376848.5 441.1 172.5 29.5 32.8 3.3 2.94
          38 57.6 19.6 3.62
          99 102 3 4.52
Table 1 – Blair Deeps , August 2006 diamond drill intercepts

L01C Shoot
Diamond drilling from the 1048 Area 57 access drive has found possible extensions to the L01 shoot. The potential extensions are approximately 130 metres above current workings.

Best intercepts are tabled below:

Hole Number Northing (m) Easting (m) RL (m) Depth (m) From (m) To (m) Length (m) Ni (%)
AMUG186 6579108.7 377066.9 1053.5 11.5 5.4 6.0 0.6 3.9
AMUG190 6579115.9 377062.9 1053.8 12.6 7.0 7.7 0.7 2.65
Table 2 – L01C Shoot , August 2006 diamond drill intercepts

Area 57 Depth Extensions
Two stratigraphic holes were drilled from the 911 decline access to test for hangingwall and open contact ore some 200 metres below the current Area 57 orebody. Although both holes failed to intercept nickel grade mineralisation, down hole electro magnetic probing (DHEM) was completed on both holes with the following positive result:
  • AMUG185 has a large and complex signal of conductance (5000 Siemens) from 149 metres down hole that has been modelled as an offhole 100 metre by 100 metre conductive plate.
  • AMUG187 returned a signal of 5000 siemens conductance from 210m down hole, which has been modelled as a 100 x 100m plate mostly below and south east of the drill hole.

This indicates potential nickel mineralisation that will be tested by further drilling.

Area 57 Hanging Wall Extensions:

Three holes have now been drilled approximately 20 metres above the 1033 sub level on the Area 57 hanging wall lode and although multiple intercepts of massive sulphides have been logged the core has yet to be assayed. Results will be released in the September Quarterly.

For further information contact:

Brett Young
Chief Operating Officer
Australian Mines Limited
Tel: 08 9481 5811

For media enquiries contact:
Robert Williams
Farrington National
Tel: 02 9332 4448

The information in this report is based on work compiled by Mr E. Poole, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Poole is employed as the Geology Manager of Australian Mines Limited. Mr Poole has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Email Subscription


Latest News
Production Increases Significantly
Australian Mines has achieved its best quarterly production result since the June 2005 quarter at the 100%-owned Blair Mine, located 32 kms from Kalgoorlie in W.A.
Continuing Strong Drill Results
Australian Mines continues to intersect significant mineralisation in its 2008 resource drilling at Blair Deeps at the Blair Mine, located 32km from Kalgoorlie WA.
Significant High Grade Drill Intersection at Blair
Australian Mines (ASX:AUZ) has recommenced 2008 resource definition drilling at Blair Deeps with drilling initially targeting the high grade E03C shoot below current workings at the Blair Nickel Mine located 32kms from Kalgoorlie.
Nickel Production Expected to Grow in 2008
Australian Mines is forecasting a continuation of improving production at its 100%-owned and operated Blair Nickel Mine following good progress with the development of the Blair Deeps orebody.
Resource Update - Marriott's Nickel Project
Australian Mines (ASX:AUZ) is pleased to announce a 25% increase in resources at its 100% owned Marriott's nickel project, following the completion of Phase 1 infill diamond drilling
Update: Marriott's Nickel Project
Australian Mines Limited (ASX: AUZ) is pleased to announce another impressive high grade intercept from resource definition diamond drilling at the Marriott's nickel project, which is 65 km from Leinster in W.A.
Copyright © 2008 Australian Mines | Disclaimer | Privacy